Free valid test braindumps
https://free.validbraindumps.com/2024/05/12/verified-latest-mb-320-dump-qas-with-correct-answers-q83-q102/
Export date: Sat Apr 5 14:09:18 2025 / +0000 GMT

Verified & Latest MB-320 Dump Q&As with Correct Answers [Q83-Q102]




Verified & Latest MB-320 Dump Q&As with Correct Answers

Latest MB-320 dumps - Instant Download PDF

NO.83 A company manufactures high-end speakers. Customers may choose different color finishes and front grills.
You build a product configuration model to represent this speaker.
You add the following attributes for the finish and grill.
You need to create a constraint that defines the allowable finish and grill combinations.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions and arrange them in the correct order.

NO.84 A company implements Dynamics 365 for Finance and Operations.
You run a master plan each week.
You need to resolve the issue in the scenario.
What should you do? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

NO.85 You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate subproduction orders.
Which BOM line type should you use?

 
 
 
 

NO.86 You are a production manager at a company that has implemented lean manufacturing using Dynamics 365 Supply Chain Management.
You have created a new Kanban rule to replace one that is expiring.
You need to determine the impact to the existing process jobs.
How are the active Kanbans of the expired rule handled?

 
 
 
 

NO.87 You need to modify the production order defaults for the manufacturing execution production order Start process.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

NO.88 A company implements Dynamic 365 for Finance and Operations. You run the latest master plan. You observe invalid results.
You need to set up tracing for the master plan.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

NO.89 You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to assign a cost of 1,000 US dollars to the night shift.
To complete this task, sign in to Dynamics 365 portal. You must complete Task 1 before completing this task. Task 1 is the creation of a new cost category named NightShift for the night shift.

NO.90 A customer produces light projection toys for holiday decorations throughout the year. Vendors have negotiated rebate agreements as a condition of their contract. The contract also contains the visual templates required for the customer to use in a season.
* Units of measure for deliverables are the same unit of measure as on the agreement.
* The agreement is valid as of the date a purchase order is generated.
You need to configure the vendor rebate agreements. What should you do?

 
 
 
 

NO.91 Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.
Product is sold by the box and priced by the pound.
You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.
Solution: Set up the product with a sales unit measure of pounds and inventory unit measure of box. Set a standard unit conversation for the product from box to pounds.
Does the solution meet the goal?

 
 

NO.92 A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NO.93 A bakery is implementing process manufacturing in Dynamics 365 Supply Chain Management. Sugar is the most widely used ingredient in the bakery items, which are baked and sold fresh daily.
The purchase price of sugar is based on the market at a point in time and is agreed upon monthly with the vendor who supplies the sugar.
The monthly changes in cost create fluctuations in the required sales margin on bakery items. The bakery requires visibility into the cost changes over time for auditing. The bakery also requires visibility into the formula cost breakdown, which is currently tracked in a spreadsheet.
You need to configure the commodity pricing.
What should you configure for each requirement? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

NO.94 You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.
Chemical product, C00D1 can be sold in all parts of the United States except for the state of California.
You need to set up these compliance requirements for C0001.
Which four actions should be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NO.95 A company plans to implement routing and route postings.
You must direct postings of route cards based upon the route groups at Report as finished.
You set the start default order setting for route posting to Never and the Report as finished setting to Route Group Dependent.
You set up the route group as shown below.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.

NO.96 A process manufacturing company is implementing Dynamics 365 for Finance and Operations. The company will use multiple process manufacturing functionalities including by-products.
You need to configure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content NOTE: Each correct selection is worth one point.

NO.97 A company produces pipe at certain fixed lengths.
The company must be able to schedule cutting machines. You set up the cutting machines as resources. All cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only some of the machines can do this.
You need to configure the resources to account for these different products.
What should you do?

 
 
 
 

NO.98 You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NO.99 A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.
The company requires that employees register time against each machine on the shop floor.
You need to configure the system so that employees can register time.
Which two configurations must be set up? Each answer represents a partial solution.
NOTE: Each correct selection is worth one point.

 
 
 
 

NO.100 A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the sample sub assembly item and resource sanding process.
You observe an increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce.
You must make a permanent change to the number of units the resource can produce for all future orders.
You need to adjust the process quantity on the route operation.
Which three actions should you perform in sequence? To answer, move the appropriate actions form the list of actions to the answer area and arrange them in the correct order.

NO.101 You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.
Chemical product, C00D1 can be sold in all parts of the United States except for the state of California.
You need to set up these compliance requirements for C0001.
Which four actions should be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NO.102 A company produces light projection toys for holiday decorations. The company plans to implement Lean manufacturing processes.
Production master data must meet the following requirements:
* Visual templates for a holiday must only be included for in-store products where that holiday is celebrated
* Visual templates for a holiday must only be included for in-store products based upon that season
* Online customers must be able to order visual templates for any holiday or region.
You need to implement production master data.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.


The Ultimate Microsoft MB-320 Dumps PDF Review: https://www.validbraindumps.com/MB-320-exam-prep.html 1

Links:
  1. https://www.validbraindumps.com/MB-320-exam-prep.h tml
Post date: 2024-05-12 15:46:41
Post date GMT: 2024-05-12 15:46:41

Post modified date: 2024-05-12 15:46:41
Post modified date GMT: 2024-05-12 15:46:41

Export date: Sat Apr 5 14:09:18 2025 / +0000 GMT
This page was exported from Free valid test braindumps [ http://free.validbraindumps.com ]