Free valid test braindumps
https://free.validbraindumps.com/2024/11/08/q27-q48-view-d-psc-mn-01-exam-question-dumps-with-latest-demo-nov-08-2024/
Export date: Sat Apr 5 13:11:40 2025 / +0000 GMT

[Q27-Q48] View D-PSC-MN-01 Exam Question Dumps With Latest Demo [Nov 08, 2024]




View D-PSC-MN-01 Exam Question Dumps With Latest Demo [Nov 08, 2024]

Free D-PSC-MN-01 Test Questions Real Practice Test Questions

NO.27 A customer has a Dell PowerScale Gen 6 cluster that is using an Ethernet backend. They have Gen 5 nodes and cables from a previous installation. A PowerScale platform engineer is on site. The customer asks the engineer if they can repurpose the Gen 5 equipment on their Gen 6 cluster.
What should the engineer advise the customer?

 
 
 
 

NO.28 Which aspect is crucial when cabling nodes in a PowerScale installation?

 
 
 
 

NO.29 What is the recommended way to install a Dell PowerScale Gen 6 compute module in a chassis?

 
 
 
 

NO.30 Which interface can the customer use to automate the retrieval of the most detailed network traffic statistics?

 
 
 
 

NO.31 What is the recommended action if a PowerScale node reports inconsistent data?

 
 
 
 

NO.32 What is the impact of network misconfiguration on a PowerScale cluster?

 
 
 
 

NO.33 During a PowerScale cluster expansion, what factors must be considered to maintain balance?

 
 
 
 

NO.34 In the context of PowerScale, what are critical steps in the rack installation process?

 
 
 
 

NO.35 Which of the following features are associated with PowerScale Gen 6.5 nodes? (Select two)

 
 
 
 

NO.36 Which of the following are critical steps when replacing a PowerScale node’s motherboard? (Select two)

 
 
 
 

NO.37 What is a key step when connecting nodes to the data center’s power supply during a PowerScale installation?

 
 
 
 

NO.38 How does the Serial Console differ from the WebUI in managing PowerScale clusters?

 
 
 
 

NO.39 Which of the following considerations is crucial when planning the installation of a PowerScale cluster?

 
 
 
 

NO.40 What is the best practice for managing versioning and patches in a PowerScale cluster?

 
 
 
 

NO.41 A platform engineer needs to power down a Dell PowerScale node to perform an FRU replacement.
Which command should they run first before making the replacement?

 
 
 
 

NO.42 The Serial Console is used in PowerScale environments primarily for what purpose?

 
 
 
 

NO.43 A Dell PowerScale platform engineer has executed the shutdown command on a three-node cluster.
The shutdown sequence displays an error and appears unresponsive.
How should the platform engineer address this issue?

 
 
 
 

NO.44 Which Dell PowerScale interface is the simplest to use for customers?

 
 
 
 

NO.45 When setting up internal networking for a PowerScale cluster, what is a crucial requirement?

 
 
 
 

NO.46 How can an administrator verify that a node is successfully shut down?

 
 
 
 

NO.47 Which action is critical when preparing the site for a PowerScale installation?

 
 
 
 

NO.48 Why is it necessary to verify the cluster’s health status before performing any hardware maintenance?

 
 
 
 

View All D-PSC-MN-01 Actual Free Exam Questions Updated: https://www.validbraindumps.com/D-PSC-MN-01-exam-prep.html 1

Links:
  1. https://www.validbraindumps.com/D-PSC-MN-01-exam-p rep.html
Post date: 2024-11-08 15:49:14
Post date GMT: 2024-11-08 15:49:14

Post modified date: 2024-11-08 15:49:14
Post modified date GMT: 2024-11-08 15:49:14

Export date: Sat Apr 5 13:11:40 2025 / +0000 GMT
This page was exported from Free valid test braindumps [ http://free.validbraindumps.com ]