This page was exported from Free valid test braindumps [ http://free.validbraindumps.com ] Export date:Sat Apr 5 13:09:12 2025 / +0000 GMT ___________________________________________________ Title: [Q27-Q48] View D-PSC-MN-01 Exam Question Dumps With Latest Demo [Nov 08, 2024] --------------------------------------------------- View D-PSC-MN-01 Exam Question Dumps With Latest Demo [Nov 08, 2024] Free D-PSC-MN-01 Test Questions Real Practice Test Questions NO.27 A customer has a Dell PowerScale Gen 6 cluster that is using an Ethernet backend. They have Gen 5 nodes and cables from a previous installation. A PowerScale platform engineer is on site. The customer asks the engineer if they can repurpose the Gen 5 equipment on their Gen 6 cluster.What should the engineer advise the customer?  Gen 5 nodes cannot be joined to a cluster with Gen 6 nodes running an Ethernet backend  Order new cables with the right connectors  Daisy chain the Gen 5 backend by InfiniBand cables, then plug them directly to the Gen 6 primary node  An InfiniBand switch must be paired with the Gen 6 back-end Ethernet switches to allow the Gen 5 nodes to join NO.28 Which aspect is crucial when cabling nodes in a PowerScale installation?  Using color-coded cables for easy identification  Ensuring cables are of the minimum required length  Verifying cable integrity with testing tools  Documenting the cabling layout NO.29 What is the recommended way to install a Dell PowerScale Gen 6 compute module in a chassis?  Support the node with both hands and slide it into the node bay.  Slide the release lever to the right and guide the node into the chassis.  Close the module lever and slide the module into the chassis until it clicks.  Loosen the thumbscrew on the release lever then slide the compute module into the chassis. NO.30 Which interface can the customer use to automate the retrieval of the most detailed network traffic statistics?  InsightIQ  Web graphical interface  OneFS API  OneFS command line NO.31 What is the recommended action if a PowerScale node reports inconsistent data?  Isolate the node immediately and perform a data integrity scan  Reboot the node to clear any temporary issues  Remove the node from the cluster and replace it  Run a synchronization process with other nodes NO.32 What is the impact of network misconfiguration on a PowerScale cluster?  Reduced data transfer speeds  Increased risk of data corruption  Inability to perform node maintenance  Loss of cluster quorum NO.33 During a PowerScale cluster expansion, what factors must be considered to maintain balance?  Network throughput and latency  Storage and compute node ratios  Data distribution and redundancy settings  Power and cooling requirements NO.34 In the context of PowerScale, what are critical steps in the rack installation process?  Determining the rack’s load capacity  Securing the rack to the floor  Aligning the rack for optimal airflow  Ensuring compatibility with PowerScale node dimensions NO.35 Which of the following features are associated with PowerScale Gen 6.5 nodes? (Select two)  Enhanced data deduplication  Improved flash technology  Advanced thermal design  Increased node capacity NO.36 Which of the following are critical steps when replacing a PowerScale node’s motherboard? (Select two)  Updating the node’s firmware to the latest version  Configuring the BIOS settings according to cluster requirements  Performing a full system backup  Verifying network port configurations NO.37 What is a key step when connecting nodes to the data center’s power supply during a PowerScale installation?  Using power cables of the shortest possible length to reduce resistance  Ensuring each node is connected to a different circuit breaker  Implementing power redundancy for each node  Labeling power cables according to the nodes they supply NO.38 How does the Serial Console differ from the WebUI in managing PowerScale clusters?  It provides a text-based interface.  It requires physical access to the node.  It offers a more detailed system view.  Both A and B NO.39 Which of the following considerations is crucial when planning the installation of a PowerScale cluster?  Ensuring sufficient cooling in the data center  Planning for future expansion  Securing adequate power supply  All of the above NO.40 What is the best practice for managing versioning and patches in a PowerScale cluster?  Regularly reviewing available updates for compatibility  Applying patches during off-peak hours to minimize impact  Testing updates in a non-production environment  Maintaining a consistent patch level across all nodes NO.41 A platform engineer needs to power down a Dell PowerScale node to perform an FRU replacement.Which command should they run first before making the replacement?  isi_celog_monitor -a  isi_gather_info  isi healthcheck  isi_hwmon -s NO.42 The Serial Console is used in PowerScale environments primarily for what purpose?  To execute file system commands  For initial setup and configuration  To monitor real-time network traffic  For remote cluster management NO.43 A Dell PowerScale platform engineer has executed the shutdown command on a three-node cluster.The shutdown sequence displays an error and appears unresponsive.How should the platform engineer address this issue?  Remove power cables separately, waiting at least five seconds between removing each of them.  Hold the power button down until the node completes shutdown.  Contact Dell Technical Support for assistance.  Execute a hardware shutdown by pressing the power button three times within five seconds. NO.44 Which Dell PowerScale interface is the simplest to use for customers?  OneFS command line  Platform application interface  Serial console  Web administration interface NO.45 When setting up internal networking for a PowerScale cluster, what is a crucial requirement?  Public IP addresses for all nodes  Private interconnects between nodes  Unrestricted internet access  Serial connection between nodes NO.46 How can an administrator verify that a node is successfully shut down?  Verify the LEDs on the front panel are not lit.  Execute the isi status -q command and see that the node is in a D— status.  Execute the isi status -q command and see that the node is in an A– status.  Try to access a share on the node and verify the share is inaccessible. NO.47 Which action is critical when preparing the site for a PowerScale installation?  Setting up remote monitoring tools  Ensuring appropriate environmental conditions, such as temperature and humidity  Configuring the initial cluster network settings  Preparing an inventory of all software applications to be used NO.48 Why is it necessary to verify the cluster’s health status before performing any hardware maintenance?  To ensure no other maintenance tasks are ongoing  To confirm there is no data loss risk  To prevent additional strain on the cluster  To ensure accurate hardware fault diagnosis  Loading … View All D-PSC-MN-01 Actual Free Exam Questions Updated: https://www.validbraindumps.com/D-PSC-MN-01-exam-prep.html --------------------------------------------------- Images: https://free.validbraindumps.com/wp-content/plugins/watu/loading.gif https://free.validbraindumps.com/wp-content/plugins/watu/loading.gif --------------------------------------------------- --------------------------------------------------- Post date: 2024-11-08 15:49:14 Post date GMT: 2024-11-08 15:49:14 Post modified date: 2024-11-08 15:49:14 Post modified date GMT: 2024-11-08 15:49:14